MONTHLY REPORTDraft

Riverside Works — July 2026

Client-facing and internal drafts ready for review.

Reporting period: 9–16 Jul 2026
Preview below ↓
WEEKLY REPORTDraft

Riverside Works — w/c 9 Jul 2026

Weekly status drafts ready for review.

Reporting period: 9–16 Jul 2026
Preview below ↓

Preview: client report

A static preview of the client-facing draft Dolemai prepares from the reviewed project position. In the app you review, amend and issue it under your own professional responsibility.

Monthly project report

Riverside Works

Prepared by: Employer's Agent
Prepared for: Hembury Developments
Reporting period: 9 July – 16 July 2026
Overall positionAmber
The project is progressing with key coordination matters outstanding. Controlled action is required before the next period.

Executive summary

The project is currently 11 days behind the approved programme, with the principal delay attributed to a DNO connection redesign on the critical path. The steelwork package has been awarded with a confirmed saving of £142k against the package allowance. Four decisions are required from the client before the end of July 2026, including confirmation of the contractor's recovery proposals. The cost position remains favourable overall, with a net movement of £104k below the approved budget after accounting for anticipated variation costs.

Programme position

Amber
Original completion14 November 2026
Current forecast25 November 2026
Delay11 days

Delay is primarily attributed to the DNO connection redesign (VAR-009). Contractor has submitted recovery proposals for PM review.

Cost position

Green
Approved budget£2,950,000
Original contract sum£2,850,000
Net cost movement−£104,000 (favourable)

Favourable movement reflects confirmed steelwork saving of £142k partially offset by anticipated MEP acoustic works of £38k.

Key risks

1.DNO connection delayCriticalOwner: PM
VAR-009 on critical path. No PM decision issued. Failure to act will prejudice ability to assess time and cost.
2.Stage 4 appointments unagreedHighOwner: Client
Scope and budget not confirmed. PM recommends extending only after scope confirmed.
3.Ground conditionsSignificantOwner: Contractor
Potential programme and cost impact not yet assessed.

Decisions required

1.Confirm contractor's programme recovery proposalsDue: 28 July 2026 · PM / Client
2.Select preferred ground floor layout optionDue: 25 July 2026 · Client
3.Approve revised MEP coordination strategyDue: 31 July 2026 · Client

PM recommendation

The DNO connection matter requires an urgent client decision this period. The PM recommends the client confirms the contractor's recovery programme by 28 July 2026 to preserve the ability to assess time and cost entitlement under the contract. The cost position remains favourable and no budget intervention is required at this stage.

AI-generated draft. Review all dates, figures, responsibilities, assumptions and professional judgements before issue.